title: "Central-West Orana REZ: transmission and land impacts"
description: "Central-West Orana transmission: construction, expected 2028 energisation and landholder easement and access issues, with official project sources."
canonical: https://stonepillar.com.au/resources/nsw-project-watch/central-west-orana-rez/
language: en-AU
last_updated: 2026-10-27
source_revision: 498ccea127247fe38494c2df5ab784af20b5625f
publisher: "Stone & Pillar Legal"
---

NSW Project Watch

# Central-West Orana Renewable Energy Zone (transmission)

Renewable Energy Zone · Central West and Orana · EnergyCo NSW

Documented stage: **Construction**

Profile publication reviewed 27 October 2026. Individual source-check dates appear below. Inclusion does not establish that any particular property will be acquired or affected.

On this page

- [Project overview](https://stonepillar.com.au/resources/nsw-project-watch/central-west-orana-rez/#overview)
- [Possible land impacts](https://stonepillar.com.au/resources/nsw-project-watch/central-west-orana-rez/#land-impacts)
- [Documents to gather](https://stonepillar.com.au/resources/nsw-project-watch/central-west-orana-rez/#documents)
- [Council areas](https://stonepillar.com.au/resources/nsw-project-watch/central-west-orana-rez/#location)
- [Official sources](https://stonepillar.com.au/resources/nsw-project-watch/central-west-orana-rez/#sources)

## Project overview

New high-voltage transmission lines, energy hubs and switching stations are being built in the Central-West Orana Renewable Energy Zone around Dubbo and Dunedoo to connect new generation to the grid.

- [EnergyCo, Central-West Orana REZ transmission project](https://www.energyco.nsw.gov.au/our-projects/central-west-orana-rez/transmission-project)
- [EnergyCo, About the Central-West Orana Renewable Energy Zone](https://energyco.nsw.gov.au/our-projects/central-west-orana-rez/about)

### Construction timetable

The network operator, ACEREZ, started construction in June 2025. EnergyCo expects energisation from 2028.

- [EnergyCo, Central-West Orana REZ transmission project](https://www.energyco.nsw.gov.au/our-projects/central-west-orana-rez/transmission-project)
- [EnergyCo, Central-West Orana REZ landholder information](https://www.energyco.nsw.gov.au/our-projects/central-west-orana-rez/landholder-information)

### Land and easement agreements

EnergyCo reports that it has acquired the land and easement rights for the transmission project, with mutual agreement reached in 97 per cent of acquisition cases.

- [EnergyCo, Central-West Orana REZ landholder information](https://www.energyco.nsw.gov.au/our-projects/central-west-orana-rez/landholder-information)

## What this could mean for a property

Renewable Energy Zone transmission is generally delivered through easements and land-access arrangements over rural land. EnergyCo reports that the land and easement rights for this project have been acquired, 97 per cent of them by agreement, so for landholders the issues now are construction access, leases and temporary occupation, the conditions attached to the easements, and compensation. Whether you host infrastructure or adjoin it, those terms are worth understanding while construction continues.

### Key things to watch

- Construction access, compounds and working conditions on or near your land
- The easement terms and conditions, if your land carries an easement
- Compensation and any landholder payment schemes
- Biosecurity, farming and severance effects

### Possible land impacts

- Transmission easements over rural and agricultural land
- Survey, investigation and construction access
- Construction compounds, leases and temporary occupation
- Farming, biosecurity, severance and land-use effects

## Possible impact types

- Easement
- Survey / investigation access
- Construction lease
- Temporary occupation
- Access change
- Business disturbance
- Severance / retained land
- Planning / corridor constraint

## Documents worth gathering

- Any easement, lease or land-access agreement, and any acquisition notice
- Your title search and deposited plan
- Farm and business records, if relevant
- Correspondence and maps from the project

## Location and relevant interests

**Council areas:** Dubbo Regional, Mid-Western Regional, Warrumbungle, Upper Hunter.

**Often relevant to:** Rural and agricultural landholders; Owners hosting or adjoining the transmission corridor; Lessees and farm businesses.

## Related land guidance

- [Transmission or renewables](https://stonepillar.com.au/issues/transmission-easements/)
- [Compulsory acquisition](https://stonepillar.com.au/services/compulsory-acquisition/)
- [Affected by a project](https://stonepillar.com.au/issues/affected-by-project/)
- [Environmental regulation](https://stonepillar.com.au/services/environmental-regulation/)

## Official sources

- [EnergyCo, Central-West Orana REZ transmission project](https://www.energyco.nsw.gov.au/our-projects/central-west-orana-rez/transmission-project)

  Source checked 27 October 2026.

- [EnergyCo, Central-West Orana REZ landholder information](https://www.energyco.nsw.gov.au/our-projects/central-west-orana-rez/landholder-information)

  Source checked 27 October 2026.

- [EnergyCo, About the Central-West Orana Renewable Energy Zone](https://energyco.nsw.gov.au/our-projects/central-west-orana-rez/about)

  Source checked 27 October 2026. Regional context only. The REZ boundary is not a transmission easement or an individual property boundary.

Project record checked 19 October 2026

Project information is indicative. It does not establish that a particular property is affected.

[Discuss this project : Central-West Orana Renewable Energy Zone (transmission)](https://stonepillar.com.au/contact/?matter=acquisition&project=central-west-orana-rez#enquiry) [Watch this project : Central-West Orana Renewable Energy Zone (transmission)](https://stonepillar.com.au/resources/nsw-project-watch/?watch=central-west-orana-rez#watch)

About the dates: the publication review records when this profile was approved for publication. Each official source has its own check date. The project record date refers to the catalogue entry. These dates do not establish that later project changes have been checked.

To cite this page: Stone & Pillar Legal, “Central-West Orana Renewable Energy Zone (transmission)”, NSW Project Watch, profile reviewed 27 October 2026, https\://stonepillar.com.au/resources/nsw-project-watch/central-west-orana-rez/

This page provides general information only. Project details may change and should be checked against official sources. The inclusion of a project on this page does not mean that any particular property will be acquired or affected. This page is not legal advice. Submitting an enquiry does not create a solicitor–client relationship, and any engagement is subject to conflict checks and written terms of engagement.

## Related project profiles

- [Project EnergyConnect](https://stonepillar.com.au/resources/nsw-project-watch/energyconnect/)
- [Hunter Transmission Project](https://stonepillar.com.au/resources/nsw-project-watch/hunter-transmission-project/)

[Find this project on the Project Watch hub](https://stonepillar.com.au/resources/nsw-project-watch/#project-central-west-orana-rez)

Where to start

## Discuss your project or land concern

Tell us what has happened and what decision you need to make. The preliminary call is to discuss whether Stone & Pillar can assist and the next step. If we can assist, scope and fees are agreed before substantive legal work begins.

[Request a call back](https://stonepillar.com.au/contact/?matter=acquisition#enquiry)

[Speak with a lawyer](https://stonepillar.com.au/contact/?matter=acquisition&project=central-west-orana-rez#schedule)

30 minutes · Phone or Teams · No charge

The complimentary 30-minute preliminary call is intended to discuss whether we can assist and what an initial scope of work would involve. It is not intended to provide legal advice. Ask us to confirm in writing the work we have agreed to undertake.

---

The information and tools on this website are general information only and are not legal advice. Please provide only a brief outline for an initial enquiry, and keep confidential or privileged documents to hand until we tell you how to provide them. Tell us any date stated in your documents. Do not assume that an enquiry or booking protects a deadline. Ask us to confirm any work we agree to undertake, including any action about a deadline. If a date is close or uncertain, seek prompt legal advice without waiting for our reply. See the full [Disclaimer](https://stonepillar.com.au/disclaimer/) and [collection notice](https://stonepillar.com.au/privacy/#collection-notice) .

© 2026 Stone & Pillar Legal · New South Wales

Stone & Pillar Legal is a business name of Stone & Pillar Pty Ltd ABN 11 698 040 854.

Liability limited by a scheme approved under professional standards legislation.