# Gosford Bypass

Road · Central Coast · Transport for NSW

Documented stage: **Planning and assessment**

Profile publication reviewed 20 November 2026. Individual source-check dates appear below. Inclusion does not establish that any particular property will be acquired or affected.

On this page

- [Project overview](https://stonepillar.com.au/resources/nsw-project-watch/gosford-bypass/#overview)
- [Possible land impacts](https://stonepillar.com.au/resources/nsw-project-watch/gosford-bypass/#land-impacts)
- [Documents to gather](https://stonepillar.com.au/resources/nsw-project-watch/gosford-bypass/#documents)
- [Council areas](https://stonepillar.com.au/resources/nsw-project-watch/gosford-bypass/#location)
- [Official sources](https://stonepillar.com.au/resources/nsw-project-watch/gosford-bypass/#sources)

## Project overview

The remaining section, about 7.2 kilometres, of the Gosford Bypass corridor along the Pacific Highway and Manns Road on the Central Coast. Transport for NSW is building shorter term improvements and reviewing the previous upgrade design for the rest.

- [Transport for NSW, Gosford Bypass](https://www.transport.nsw.gov.au/projects/current-projects/gosford-bypass)

### The corridor

The Gosford Bypass corridor runs from the M1 Pacific Motorway at Ourimbah to the Central Coast Highway at West Gosford, along the Pacific Highway and then Manns Road. Transport for NSW says the sections from the M1 to Parsons Road, Lisarow and from the Central Coast Highway to Stockyard Place are complete, and that the corridor has been built progressively over the last 20 years.

- [Transport for NSW, Gosford Bypass](https://www.transport.nsw.gov.au/projects/current-projects/gosford-bypass)

### Shorter term works

Three shorter term projects were selected for construction. The Manns Road and Stockyard Place intersection upgrade is complete. Work has started on a roundabout capacity improvement at the Pacific Highway and Parsons Road, and on safety and pedestrian improvements on the Pacific Highway between Newling Street and Kathleen Morreau Road. The Manns Road section between Stockyard Place and Narara Creek Road is tracked as its own entry.

- [Transport for NSW, Gosford Bypass](https://www.transport.nsw.gov.au/projects/current-projects/gosford-bypass)
- [Infrastructure NSW, Major Projects Pipeline (In planning)](https://www.infrastructure.nsw.gov.au/industry/construction-industry/pipeline-of-projects/)

### Future major works

The NSW Government is investing $40 million in continued planning and design. Transport for NSW is reviewing the previous upgrade design to identify staging and priorities, and says any future major works on the remaining 7.2 kilometres, including any property acquisition, depend on project and funding approvals.

- [Transport for NSW, Gosford Bypass](https://www.transport.nsw.gov.au/projects/current-projects/gosford-bypass)

## What this could mean for a property

Transport for NSW says development of the remaining 7.2 kilometres has included identifying the preferred road alignment for some of the route and the associated property impacts. It also says any future major works, including any property acquisition, depend on project and funding approvals. The project page gives no timetable for any acquisition along the remaining section between Parsons Road, Lisarow and Stockyard Place. A project being planned near you does not mean your property will be acquired.

### Key things to watch

- The outcome of the design review and any decision on staging
- Whether your land is within a corridor or work area
- Any survey, valuation or acquisition correspondence
- Severance, access and retained-land effects

### Possible land impacts

- Whole or partial acquisition of land within the corridor
- Severance and injurious affection for retained land
- Changed property access and local road connections
- Construction noise, vibration and amenity impacts

## Possible impact types

- Whole-property acquisition
- Partial acquisition
- Severance / retained land
- Access change
- Noise / vibration / amenity
- Business disturbance
- Planning / corridor constraint

## Documents worth gathering

- Any letter or notice from the project
- Your title search and deposited plan
- Valuation, rating or appraisal material
- Business records, if a business is affected

## Location and relevant interests

**Council areas:** Central Coast.

**Often relevant to:** Owners of land on or near the route options; Adjoining owners affected by a new corridor; Local businesses affected by access changes.

## Related land guidance

- [My land is being acquired](https://stonepillar.com.au/issues/land-acquisition/)
- [Affected by a project](https://stonepillar.com.au/issues/affected-by-project/)
- [Compulsory acquisition](https://stonepillar.com.au/services/compulsory-acquisition/)

## Official sources

- [Transport for NSW, Gosford Bypass](https://www.transport.nsw.gov.au/projects/current-projects/gosford-bypass)

  Source checked 20 November 2026.

- [Infrastructure NSW, Major Projects Pipeline (In planning)](https://www.infrastructure.nsw.gov.au/industry/construction-industry/pipeline-of-projects/)

  Source checked 20 November 2026. Rows read on 20 November 2026 from the pipeline page, last updated 28 September 2026: Gosford Bypass, in planning, value to be advised. The Manns Road upgrade from Stockyard Place to Narara Creek Road is a separate row.

Project record checked 19 October 2026

Project information is indicative. It does not establish that a particular property is affected.

[Discuss this project : Gosford Bypass](https://stonepillar.com.au/contact/?matter=acquisition&project=gosford-bypass#enquiry) [Watch this project : Gosford Bypass](https://stonepillar.com.au/resources/nsw-project-watch/?watch=gosford-bypass#watch)

About the dates: the publication review records when this profile was approved for publication. Each official source has its own check date. The project record date refers to the catalogue entry. These dates do not establish that later project changes have been checked.

To cite this page: Stone & Pillar Legal, “Gosford Bypass”, NSW Project Watch, profile reviewed 20 November 2026, https\://stonepillar.com.au/resources/nsw-project-watch/gosford-bypass/

This page provides general information only. Project details may change and should be checked against official sources. The inclusion of a project on this page does not mean that any particular property will be acquired or affected. This page is not legal advice. Submitting an enquiry does not create a solicitor–client relationship, and any engagement is subject to conflict checks and written terms of engagement.

[Find this project on the Project Watch hub](https://stonepillar.com.au/resources/nsw-project-watch/#project-gosford-bypass)

Where to start

## Discuss your project or land concern

Tell us what has happened and what decision you need to make. The preliminary call is to discuss whether Stone & Pillar can assist and the next step. If we can assist, scope and fees are agreed before substantive legal work begins.

[Request a call back](https://stonepillar.com.au/contact/?matter=acquisition#enquiry)

[Speak with a lawyer](https://stonepillar.com.au/contact/?matter=acquisition&project=gosford-bypass#schedule)

30 minutes · Phone or Teams · No charge

The complimentary 30-minute preliminary call is intended to discuss whether we can assist and what an initial scope of work would involve. It is not intended to provide legal advice. Ask us to confirm in writing the work we have agreed to undertake.

---

The information and tools on this website are general information only and are not legal advice. Please provide only a brief outline for an initial enquiry, and keep confidential or privileged documents to hand until we tell you how to provide them. Tell us any date stated in your documents. Do not assume that an enquiry or booking protects a deadline. Ask us to confirm any work we agree to undertake, including any action about a deadline. If a date is close or uncertain, seek prompt legal advice without waiting for our reply. See the full [Disclaimer](https://stonepillar.com.au/disclaimer/) and [collection notice](https://stonepillar.com.au/privacy/#collection-notice) .

© 2026 Stone & Pillar Legal · New South Wales

Stone & Pillar Legal is a business name of Stone & Pillar Pty Ltd ABN 11 698 040 854.

Liability limited by a scheme approved under professional standards legislation.