Picton Bypass
Road · Greater Sydney · Transport for NSW
Documented stage: Planning and assessment
Profile publication reviewed . Individual source-check dates appear below. Inclusion does not establish that any particular property will be acquired or affected.
Project overview
A proposed 1.9 kilometre arterial road bypassing Picton town centre in Wollondilly, connecting Remembrance Driveway and Picton Road. The review of environmental factors and proposed design are on public display, and Transport for NSW says feedback closes on 18 December 2026.
Public display
Transport for NSW put the review of environmental factors and proposed design on public display in November 2026. It says feedback closes at 11:59 pm on Friday 18 December 2026, and that a determination report summarising the feedback and its responses will be published after the display period.
Proposed route
The proposed corridor is a new two-lane, two-way road between Remembrance Driveway, south of Wonga Road, and Picton Road, north-west of Maldon Bridge Road. It would link Thirlmere and Tahmoor with the Hume Motorway via Picton Road. Transport for NSW consulted on the corridor between December 2020 and February 2021.
Funding and timing
The Australian and NSW Governments have committed more than $21 million to planning. Transport for NSW's November 2026 answers to common questions say the project is in the planning stage, that construction will begin once it moves into delivery and funding has been secured, and that a final delivery cost has not been confirmed.
What this could mean for a property
Transport for NSW says the review of environmental factors assesses the proposal's potential property impacts, and that any proposed changes to property access or local road connections are identified in the consultation materials. A project being planned near you does not mean your property will be acquired.
Key things to watch
- The review of environmental factors put on public display in November 2026, and the determination report that follows
- Whether your land is within a corridor or work area
- Any survey, valuation or acquisition correspondence
- Severance, access and retained-land effects
Possible land impacts
- Whole or partial acquisition of land within the corridor
- Severance and injurious affection for retained land
- Changed property access and local road connections
- Construction noise, vibration and amenity impacts
Possible impact types
Documents worth gathering
- Any letter or notice from the project
- Your title search and deposited plan
- Valuation, rating or appraisal material
- Business records, if a business is affected
Location and relevant interests
Council areas: Wollondilly.
Often relevant to: Owners of land on or near the route options; Adjoining owners affected by a new corridor; Local businesses affected by access changes.
Official sources
- Transport for NSW, Picton Bypass
Source checked .
- Transport for NSW, Picton Bypass frequently asked questions (November 2026)
Source checked .
- Infrastructure NSW, Major Projects Pipeline (In planning)
Source checked . Row read on 20 November 2026 from the pipeline page, last updated 28 September 2026: Picton Bypass, in planning, $500 million to $1 billion.
Project record checked
Project information is indicative. It does not establish that a particular property is affected.
Where to start
Discuss your project or land concern
Tell us what has happened and what decision you need to make. The preliminary call is to discuss whether Stone & Pillar can assist and the next step. If we can assist, scope and fees are agreed before substantive legal work begins.
30 minutes · Phone or Teams · No charge
The complimentary 30-minute preliminary call is intended to discuss whether we can assist and what an initial scope of work would involve. It is not intended to provide legal advice. Ask us to confirm in writing the work we have agreed to undertake.