Picton Bypass

Road · Greater Sydney · Transport for NSW

Documented stage: Planning and assessment

Profile publication reviewed . Individual source-check dates appear below. Inclusion does not establish that any particular property will be acquired or affected.

Project overview

A proposed 1.9 kilometre arterial road bypassing Picton town centre in Wollondilly, connecting Remembrance Driveway and Picton Road. The review of environmental factors and proposed design are on public display, and Transport for NSW says feedback closes on 18 December 2026.

Public display

Transport for NSW put the review of environmental factors and proposed design on public display in November 2026. It says feedback closes at 11:59 pm on Friday 18 December 2026, and that a determination report summarising the feedback and its responses will be published after the display period.

Proposed route

The proposed corridor is a new two-lane, two-way road between Remembrance Driveway, south of Wonga Road, and Picton Road, north-west of Maldon Bridge Road. It would link Thirlmere and Tahmoor with the Hume Motorway via Picton Road. Transport for NSW consulted on the corridor between December 2020 and February 2021.

Funding and timing

The Australian and NSW Governments have committed more than $21 million to planning. Transport for NSW's November 2026 answers to common questions say the project is in the planning stage, that construction will begin once it moves into delivery and funding has been secured, and that a final delivery cost has not been confirmed.

What this could mean for a property

Transport for NSW says the review of environmental factors assesses the proposal's potential property impacts, and that any proposed changes to property access or local road connections are identified in the consultation materials. A project being planned near you does not mean your property will be acquired.

Key things to watch

  • The review of environmental factors put on public display in November 2026, and the determination report that follows
  • Whether your land is within a corridor or work area
  • Any survey, valuation or acquisition correspondence
  • Severance, access and retained-land effects

Possible land impacts

  • Whole or partial acquisition of land within the corridor
  • Severance and injurious affection for retained land
  • Changed property access and local road connections
  • Construction noise, vibration and amenity impacts

Possible impact types

  • Whole-property acquisition
  • Partial acquisition
  • Severance / retained land
  • Access change
  • Noise / vibration / amenity
  • Planning / corridor constraint

Documents worth gathering

  • Any letter or notice from the project
  • Your title search and deposited plan
  • Valuation, rating or appraisal material
  • Business records, if a business is affected

Location and relevant interests

Council areas: Wollondilly.

Often relevant to: Owners of land on or near the route options; Adjoining owners affected by a new corridor; Local businesses affected by access changes.

Official sources

Project record checked

Project information is indicative. It does not establish that a particular property is affected.

Find this project on the Project Watch hub

Where to start

Discuss your project or land concern

Tell us what has happened and what decision you need to make. The preliminary call is to discuss whether Stone & Pillar can assist and the next step. If we can assist, scope and fees are agreed before substantive legal work begins.