# Picton Bypass

Road · Greater Sydney · Transport for NSW

Documented stage: **Planning and assessment**

Profile publication reviewed 20 November 2026. Individual source-check dates appear below. Inclusion does not establish that any particular property will be acquired or affected.

On this page

- [Project overview](https://stonepillar.com.au/resources/nsw-project-watch/picton-bypass/#overview)
- [Possible land impacts](https://stonepillar.com.au/resources/nsw-project-watch/picton-bypass/#land-impacts)
- [Documents to gather](https://stonepillar.com.au/resources/nsw-project-watch/picton-bypass/#documents)
- [Council areas](https://stonepillar.com.au/resources/nsw-project-watch/picton-bypass/#location)
- [Official sources](https://stonepillar.com.au/resources/nsw-project-watch/picton-bypass/#sources)

## Project overview

A proposed 1.9 kilometre arterial road bypassing Picton town centre in Wollondilly, connecting Remembrance Driveway and Picton Road. The review of environmental factors and proposed design are on public display, and Transport for NSW says feedback closes on 18 December 2026.

- [Transport for NSW, Picton Bypass](https://www.transport.nsw.gov.au/projects/current-projects/picton-bypass)

### Public display

Transport for NSW put the review of environmental factors and proposed design on public display in November 2026. It says feedback closes at 11:59 pm on Friday 18 December 2026, and that a determination report summarising the feedback and its responses will be published after the display period.

- [Transport for NSW, Picton Bypass](https://www.transport.nsw.gov.au/projects/current-projects/picton-bypass)

### Proposed route

The proposed corridor is a new two-lane, two-way road between Remembrance Driveway, south of Wonga Road, and Picton Road, north-west of Maldon Bridge Road. It would link Thirlmere and Tahmoor with the Hume Motorway via Picton Road. Transport for NSW consulted on the corridor between December 2020 and February 2021.

- [Transport for NSW, Picton Bypass](https://www.transport.nsw.gov.au/projects/current-projects/picton-bypass)
- [Transport for NSW, Picton Bypass frequently asked questions (November 2026)](https://www.transport.nsw.gov.au/system/files/media/documents/2026/picton-bypass-faq-november-2026.pdf)

### Funding and timing

The Australian and NSW Governments have committed more than $21 million to planning. Transport for NSW's November 2026 answers to common questions say the project is in the planning stage, that construction will begin once it moves into delivery and funding has been secured, and that a final delivery cost has not been confirmed.

- [Transport for NSW, Picton Bypass](https://www.transport.nsw.gov.au/projects/current-projects/picton-bypass)
- [Transport for NSW, Picton Bypass frequently asked questions (November 2026)](https://www.transport.nsw.gov.au/system/files/media/documents/2026/picton-bypass-faq-november-2026.pdf)

## What this could mean for a property

Transport for NSW says the review of environmental factors assesses the proposal's potential property impacts, and that any proposed changes to property access or local road connections are identified in the consultation materials. A project being planned near you does not mean your property will be acquired.

### Key things to watch

- The review of environmental factors put on public display in November 2026, and the determination report that follows
- Whether your land is within a corridor or work area
- Any survey, valuation or acquisition correspondence
- Severance, access and retained-land effects

### Possible land impacts

- Whole or partial acquisition of land within the corridor
- Severance and injurious affection for retained land
- Changed property access and local road connections
- Construction noise, vibration and amenity impacts

## Possible impact types

- Whole-property acquisition
- Partial acquisition
- Severance / retained land
- Access change
- Noise / vibration / amenity
- Planning / corridor constraint

## Documents worth gathering

- Any letter or notice from the project
- Your title search and deposited plan
- Valuation, rating or appraisal material
- Business records, if a business is affected

## Location and relevant interests

**Council areas:** Wollondilly.

**Often relevant to:** Owners of land on or near the route options; Adjoining owners affected by a new corridor; Local businesses affected by access changes.

## Related land guidance

- [My land is being acquired](https://stonepillar.com.au/issues/land-acquisition/)
- [Affected by a project](https://stonepillar.com.au/issues/affected-by-project/)
- [Compulsory acquisition](https://stonepillar.com.au/services/compulsory-acquisition/)

## Official sources

- [Transport for NSW, Picton Bypass](https://www.transport.nsw.gov.au/projects/current-projects/picton-bypass)

  Source checked 20 November 2026.

- [Transport for NSW, Picton Bypass frequently asked questions (November 2026)](https://www.transport.nsw.gov.au/system/files/media/documents/2026/picton-bypass-faq-november-2026.pdf)

  Source checked 20 November 2026.

- [Infrastructure NSW, Major Projects Pipeline (In planning)](https://www.infrastructure.nsw.gov.au/industry/construction-industry/pipeline-of-projects/)

  Source checked 20 November 2026. Row read on 20 November 2026 from the pipeline page, last updated 28 September 2026: Picton Bypass, in planning, $500 million to $1 billion.

Project record checked 19 October 2026

Project information is indicative. It does not establish that a particular property is affected.

[Discuss this project : Picton Bypass](https://stonepillar.com.au/contact/?matter=acquisition&project=picton-bypass#enquiry) [Watch this project : Picton Bypass](https://stonepillar.com.au/resources/nsw-project-watch/?watch=picton-bypass#watch)

About the dates: the publication review records when this profile was approved for publication. Each official source has its own check date. The project record date refers to the catalogue entry. These dates do not establish that later project changes have been checked.

To cite this page: Stone & Pillar Legal, “Picton Bypass”, NSW Project Watch, profile reviewed 20 November 2026, https\://stonepillar.com.au/resources/nsw-project-watch/picton-bypass/

This page provides general information only. Project details may change and should be checked against official sources. The inclusion of a project on this page does not mean that any particular property will be acquired or affected. This page is not legal advice. Submitting an enquiry does not create a solicitor–client relationship, and any engagement is subject to conflict checks and written terms of engagement.

[Find this project on the Project Watch hub](https://stonepillar.com.au/resources/nsw-project-watch/#project-picton-bypass)

Where to start

## Discuss your project or land concern

Tell us what has happened and what decision you need to make. The preliminary call is to discuss whether Stone & Pillar can assist and the next step. If we can assist, scope and fees are agreed before substantive legal work begins.

[Request a call back](https://stonepillar.com.au/contact/?matter=acquisition#enquiry)

[Speak with a lawyer](https://stonepillar.com.au/contact/?matter=acquisition&project=picton-bypass#schedule)

30 minutes · Phone or Teams · No charge

The complimentary 30-minute preliminary call is intended to discuss whether we can assist and what an initial scope of work would involve. It is not intended to provide legal advice. Ask us to confirm in writing the work we have agreed to undertake.

---

The information and tools on this website are general information only and are not legal advice. Please provide only a brief outline for an initial enquiry, and keep confidential or privileged documents to hand until we tell you how to provide them. Tell us any date stated in your documents. Do not assume that an enquiry or booking protects a deadline. Ask us to confirm any work we agree to undertake, including any action about a deadline. If a date is close or uncertain, seek prompt legal advice without waiting for our reply. See the full [Disclaimer](https://stonepillar.com.au/disclaimer/) and [collection notice](https://stonepillar.com.au/privacy/#collection-notice) .

© 2026 Stone & Pillar Legal · New South Wales

Stone & Pillar Legal is a business name of Stone & Pillar Pty Ltd ABN 11 698 040 854.

Liability limited by a scheme approved under professional standards legislation.