Infrastructure projects that may affect land in New England and North West

7 of the 142 projects on NSW Project Watch are in New England and North West, across 11 council areas. Each is listed below by the stage it has reached, with its agency and a link to its profile.

Project information is indicative. It does not establish that a particular property is affected. Last checked .

Stage

Early investigation: 1 project

  • Tamworth Intervalley Pipelines & Off River Storage Project

    Early investigation Water and utilities DCCEEW Water Group (formerly Water Infrastructure NSW)

    Council areas: Tamworth Regional.

    Tamworth Intervalley Pipelines & Off River Storage Project is listed in the NSW Major Projects Infrastructure Pipeline as a water infrastructure project in planning, with a listed value of $100M to $250M. It is a preliminary business case assessing options for Tamworth's water security, including a small off-river storage upstream of Tamworth, a pipeline from the Manning River catchment to Chaffey Dam with a new weir on the Barnard River, and pipelines from Keepit Dam or Split Rock Dam to the Calala Water Treatment Plant. No option has been selected. Water Infrastructure NSW planned the project; the NSW Department of Climate Change, Energy, the Environment and Water says its Water Group now leads the development and delivery of the state's water infrastructure projects, and the project page sits on the department's water site.

    Read the Tamworth Intervalley Pipelines & Off River Storage Project profile

Stage

Corridor / option identified: 1 project

  • Port to REZ road upgrades: Tamworth oversize and overmass route

    Corridor / option identified Road EnergyCo

    Council areas: Tamworth Regional.

    EnergyCo is planning road upgrades so that oversize and overmass vehicles carrying wind turbine and transmission components to the New England Renewable Energy Zone can bypass the Tamworth CBD. The route it confirmed in March 2026 follows Whitehouse Lane, Marsden Park Road, O'Briens Lane and Nundle Road before rejoining the New England Highway at Nemingha, and EnergyCo is seeking feedback until 28 October 2026 on proposed upgrades at five intersections and the sealing of unsealed sections of Whitehouse Lane and Marsden Park Road. The works will be assessed in a minor works review of environmental factors, and EnergyCo's September 2026 development report forecasts construction from 2027, with oversize deliveries to the New England REZ expected from mid 2028.

    Read the Port to REZ road upgrades: Tamworth oversize and overmass route profile

Stage

Planning and assessment: 3 projects

  • Goonoo Goonoo Road widening, Tamworth

    Planning and assessment Road Transport for NSW

    Council areas: Tamworth Regional.

    Goonoo Goonoo Road widening, Tamworth is listed in the NSW Major Projects Infrastructure Pipeline as a transport project at the design stage, with a listed value of $50M to $100M.

    Read the Goonoo Goonoo Road widening, Tamworth profile

  • New England Renewable Energy Zone

    Planning and assessment Renewable Energy Zone EnergyCo NSW

    Council areas: Singleton, Muswellbrook, Upper Hunter, Tamworth Regional, Walcha, Uralla, Armidale Regional.

    A declared Renewable Energy Zone centred on Armidale in the New England region, planned for an initial network capacity of 6 gigawatts. The environmental impact statement for the New England REZ Network Infrastructure Project, which proposes new dual 500 kV transmission lines, energy hubs and related infrastructure connecting the zone to the existing grid at Bayswater near Muswellbrook, is available through the NSW Planning Portal. See the NSW Planning Portal for the environmental impact statement, current assessment status and information about submissions. The assessment covers a corridor about 250 metres wide within a refined corridor about 1 kilometre wide, narrowed from about 3 kilometres. EnergyCo has deferred the northern connection, removing about 13 kilometres of line and 6 affected landholders. It expects to begin discussions with landholders about construction easements later in 2026, and a network operator is being procured, with a preferred operator expected by late 2027.

    Read the New England Renewable Energy Zone profile

  • Tamworth Advanced Water Treatment Plant

    Planning and assessment Water and utilities DCCEEW Water Group (formerly Water Infrastructure NSW)

    Council areas: Tamworth Regional.

    A proposal to treat up to 12 megalitres a day of wastewater from local food industry facilities in Tamworth for reuse, with a treatment plant, brine concentration and salt lagoons, reservoirs, pipelines and a power supply upgrade. The NSW Government's water agency is developing a full business case, which it expected to complete in mid 2026. The project no longer appears in the Infrastructure NSW pipeline data. Water Infrastructure NSW planned the project; the NSW Department of Climate Change, Energy, the Environment and Water says its Water Group now leads the development and delivery of the state's water infrastructure projects, and the project page sits on the department's water site.

    Read the Tamworth Advanced Water Treatment Plant profile

Stage

Procurement / delivery: 2 projects

  • Moree Special Activation Precinct

    Procurement / delivery Urban renewal and precinct NSW Government

    Council areas: Moree Plains.

    Moree Special Activation Precinct is listed in the NSW Major Projects Infrastructure Pipeline as a commercial project at the construction procurement stage, with a listed value of $100M to $250M. In March 2026 the NSW Government revised the infrastructure works to service about 100 hectares of government-owned land with new road, drainage and utilities.

    Read the Moree Special Activation Precinct profile

  • Reconnecting the Northern Basin Project: Fish Passage

    Procurement / delivery Water and utilities DCCEEW Water Group (formerly Water Infrastructure NSW)

    Council areas: Walgett, Bourke, Central Darling.

    Reconnecting the Northern Basin Project: Fish Passage was listed in the NSW Major Projects Infrastructure Pipeline at the construction procurement stage, with a listed value of $50M to $100M, before its July 2026 edition, which no longer includes it. The department says works are expected to start from October 2026 at the Banarway, Calmundi, Louth and Tilpa weirs and to continue until mid 2027, and that access to one of the weir sites is through private property. Water Infrastructure NSW planned the project; the NSW Department of Climate Change, Energy, the Environment and Water says its Water Group now leads the development and delivery of the state's water infrastructure projects, and the project page sits on the department's water site.

    Read the Reconnecting the Northern Basin Project: Fish Passage profile

Where

Council areas named by these projects

Armidale Regional, Bourke, Central Darling, Moree Plains, Muswellbrook, Singleton, Tamworth Regional, Upper Hunter, Uralla, Walcha, Walgett.

A council area is listed when a project's record names it; a project can affect land outside the areas its record names. To search by suburb, postcode or council, use the Project Watch map.

Where to start

Discuss a project or land concern

Tell us what has happened and what decision you need to make. The preliminary call is to discuss whether Stone & Pillar can assist and the next step. If we can assist, scope and fees are agreed before substantive legal work begins.

Request a call back

Speak with a lawyer

30 minutes · Phone or Teams · No charge

The complimentary 30-minute preliminary call is intended to discuss whether we can assist and what an initial scope of work would involve. It is not intended to provide legal advice. Ask us to confirm in writing the work we have agreed to undertake.

Speak with a lawyer Call