NSW Project Watch

# Infrastructure projects that may affect land in Riverina and Southern NSW

13 of the 142 projects on NSW Project Watch are in Riverina and Southern NSW, across 13 council areas. Each is listed below by the stage it has reached, with its agency and a link to its profile.

Project information is indicative. It does not establish that a particular property is affected. Last checked 19 October 2026.

On this page

- [Early investigation (1)](https://stonepillar.com.au/resources/nsw-project-watch/region/riverina-southern-nsw/#stage-early_investigation)
- [Planning and assessment (4)](https://stonepillar.com.au/resources/nsw-project-watch/region/riverina-southern-nsw/#stage-planning_or_environmental_assessment)
- [Approved / committed (1)](https://stonepillar.com.au/resources/nsw-project-watch/region/riverina-southern-nsw/#stage-approved_or_committed)
- [Procurement / delivery (3)](https://stonepillar.com.au/resources/nsw-project-watch/region/riverina-southern-nsw/#stage-procurement_or_delivery)
- [Construction (4)](https://stonepillar.com.au/resources/nsw-project-watch/region/riverina-southern-nsw/#stage-construction)
- [Council areas](https://stonepillar.com.au/resources/nsw-project-watch/region/riverina-southern-nsw/#council-areas)

Stage

## Early investigation: 1 project

- ### [Reconnecting River Country Program: Murray Project](https://stonepillar.com.au/resources/nsw-project-watch/#project-reconnecting-river-country-murray)

  Early investigation Water and utilities DCCEEW Water Group (formerly Water Infrastructure NSW)

  The Murray Project of the Reconnecting River Country Program covers the Hume to Yarrawonga and Yarrawonga to Wakool reaches of the Murray. The department says the program has not yet developed a Final Business Case for the Murray, that a recommended flow limit cannot be determined until the benefits and risks of all options are considered, and that landholder engagement in the Murray program area is paused while Basin jurisdictions consider the Murray-Darling Basin Authority's Constraints Relaxation Implementation Roadmap. Funding to December 2026 allows technical studies for a future business case and replacement of ageing water infrastructure in the Werai Forest, which is tracked with the program's early works. The program's Murrumbidgee Project is tracked as its own entry. Water Infrastructure NSW planned the project; the NSW Department of Climate Change, Energy, the Environment and Water says its Water Group now leads the development and delivery of the state's water infrastructure projects, and the project page sits on the department's water site.

  [Read the Reconnecting River Country Program: Murray Project profile](https://stonepillar.com.au/resources/nsw-project-watch/#project-reconnecting-river-country-murray)

Stage

## Planning and assessment: 4 projects

- ### [Barton Highway upgrade: Stage 2](https://stonepillar.com.au/resources/nsw-project-watch/#project-barton-highway-upgrade-stage-2)

  Planning and assessment Road Transport for NSW

  **Council areas:** Yass Valley.

  Barton Highway upgrade: Stage 2 is listed in the NSW Major Projects Infrastructure Pipeline as a transport project in planning, with a listed value of $100M to $250M. Transport for NSW is developing the concept design for duplication from Kaveneys Road at Jeir towards Murrumbateman, with consultation on the concept design and review of environmental factors scheduled for 2026.

  [Read the Barton Highway upgrade: Stage 2 profile](https://stonepillar.com.au/resources/nsw-project-watch/#project-barton-highway-upgrade-stage-2)

- ### [Olympic Highway, Harris Gates grade separation for Inland Rail](https://stonepillar.com.au/resources/nsw-project-watch/#project-olympic-highway-harris-gates-grade-separation)

  Planning and assessment Road Transport for NSW

  **Council areas:** Junee.

  Olympic Highway, Harris Gates grade separation for Inland Rail is listed in the NSW Major Projects Infrastructure Pipeline as a transport project in planning, with no value published.

  [Read the Olympic Highway, Harris Gates grade separation for Inland Rail profile](https://stonepillar.com.au/resources/nsw-project-watch/#project-olympic-highway-harris-gates-grade-separation)

- ### [Sheahan Bridge Upgrade Northbound, Gundagai](https://stonepillar.com.au/resources/nsw-project-watch/#project-sheahan-bridge-upgrade-northbound-gundagai)

  Planning and assessment Road Transport for NSW

  **Council areas:** Cootamundra-Gundagai Regional.

  Sheahan Bridge Upgrade Northbound, Gundagai is listed in the NSW Major Projects Infrastructure Pipeline as a transport project in planning, with no value published. In July 2026 Transport for NSW identified a new bridge on the existing alignment as the preferred option, with the concept design and review of environmental factors expected on public display in mid 2027; construction funding has not been committed.

  [Read the Sheahan Bridge Upgrade Northbound, Gundagai profile](https://stonepillar.com.au/resources/nsw-project-watch/#project-sheahan-bridge-upgrade-northbound-gundagai)

- ### [VNI West (NSW section) and South West REZ network upgrade](https://stonepillar.com.au/resources/nsw-project-watch/vni-west-nsw/)

  Planning and assessment Transmission and energy Transgrid

  **Council areas:** Murray River, Edward River, Murrumbidgee, Wagga Wagga.

  A proposed 500 kV double-circuit transmission line linking the NSW and Victorian electricity grids. In NSW it would run for about 240 kilometres between the Victorian border near Murrabit and the Dinawan substation north of Jerilderie. Transgrid's project page, read on 20 November 2026, says the Department of Planning, Housing and Infrastructure is reviewing the application and that Transgrid anticipates a decision on project approval in late 2026.

  [Read the VNI West (NSW section) and South West REZ network upgrade profile](https://stonepillar.com.au/resources/nsw-project-watch/vni-west-nsw/)

Stage

## Approved / committed: 1 project

- ### [Reconnecting River Country Program: Murrumbidgee Project](https://stonepillar.com.au/resources/nsw-project-watch/#project-reconnecting-river-country-murrumbidgee-murray)

  Approved / committed Water and utilities DCCEEW Water Group (formerly Water Infrastructure NSW)

  The Murrumbidgee Project of the Reconnecting River Country Program would allow larger environmental water releases so the river connects with its wetlands and floodplains more often, with a recommended upper flow limit of 40,000 megalitres a day at Wagga Wagga. Phase 1 (2025 to 2026) focuses on agreements with the most affected landholders, between Darlington Point and Balranald: the Minister gazetted the Landholder Negotiation Scheme Order (the Declaration Order) on 29 August 2025, and negotiations are under way for inundation easements registered on title, with compensation under the Land Acquisition (Just Terms Compensation) Act 1991. The department says negotiations for deeds of release will commence with selected eligible landholders whose properties have minimal inundation impacts in the Phase 1 area; negotiations with other eligible landholders depend on additional funding and Basin Plan considerations. The department states that compulsory acquisition may be pursued as a last resort with the Minister's approval, and not before December 2026. Phase 2 (2027 to 2031) is subject to further Australian Government funding. In 2026 the program's constraints projects were withdrawn from the Basin Plan's Sustainable Diversion Limit Adjustment Mechanism, and the NSW Government says the program continues under its funding agreement with the Australian Government. The program's Murray Project and its early works are tracked as their own entries. Water Infrastructure NSW planned the project; the NSW Department of Climate Change, Energy, the Environment and Water says its Water Group now leads the development and delivery of the state's water infrastructure projects, and the project page sits on the department's water site.

  [Read the Reconnecting River Country Program: Murrumbidgee Project profile](https://stonepillar.com.au/resources/nsw-project-watch/#project-reconnecting-river-country-murrumbidgee-murray)

Stage

## Procurement / delivery: 3 projects

- ### [Snowy Mountains Special Activation Precinct: wastewater treatment plant](https://stonepillar.com.au/resources/nsw-project-watch/#project-snowy-mountains-sap-wastewater-treatment-plant)

  Procurement / delivery Water and utilities NSW Government

  **Council areas:** Snowy Monaro Regional.

  Snowy Mountains Special Activation Precinct: wastewater treatment plant is listed in the NSW Major Projects Infrastructure Pipeline as a project at the construction procurement stage, with a listed value of $50M to $100M. The upgrade of the Jindabyne sewage treatment plant, delivered by NSW Public Works, will increase capacity from 8,000 to 16,000 equivalent persons; no construction contract award had been published as at September 2026.

  [Read the Snowy Mountains Special Activation Precinct: wastewater treatment plant profile](https://stonepillar.com.au/resources/nsw-project-watch/#project-snowy-mountains-sap-wastewater-treatment-plant)

- ### [Snowy Mountains Special Activation Precinct: water treatment plant](https://stonepillar.com.au/resources/nsw-project-watch/#project-snowy-mountains-sap-water-treatment-plant)

  Procurement / delivery Water and utilities NSW Government

  **Council areas:** Snowy Monaro Regional.

  Snowy Mountains Special Activation Precinct: water treatment plant is listed in the NSW Major Projects Infrastructure Pipeline as a project at the construction procurement stage, with a listed value of $50M to $100M. A design and construct tender for a new Jindabyne water treatment plant, delivered by NSW Public Works, closed in January 2026; no contract award had been published as at September 2026.

  [Read the Snowy Mountains Special Activation Precinct: water treatment plant profile](https://stonepillar.com.au/resources/nsw-project-watch/#project-snowy-mountains-sap-water-treatment-plant)

- ### [Wagga Wagga Special Activation Precinct](https://stonepillar.com.au/resources/nsw-project-watch/#project-wagga-wagga-special-activation-precinct)

  Procurement / delivery Urban renewal and precinct NSW Government

  **Council areas:** Wagga Wagga.

  Wagga Wagga Special Activation Precinct is listed in the NSW Major Projects Infrastructure Pipeline as a commercial project at the construction procurement stage, with a listed value of $100M to $250M.

  [Read the Wagga Wagga Special Activation Precinct profile](https://stonepillar.com.au/resources/nsw-project-watch/#project-wagga-wagga-special-activation-precinct)

Stage

## Construction: 4 projects

- ### [HumeLink](https://stonepillar.com.au/resources/nsw-project-watch/humelink/)

  Construction Transmission and energy Transgrid

  **Council areas:** Wagga Wagga, Snowy Valleys, Cootamundra-Gundagai Regional, Hilltops, Yass Valley, Upper Lachlan Shire, Goulburn Mulwaree.

  A 500 kV electricity transmission line connecting Wagga Wagga, Bannaby and Maragle in southern NSW, with about 365 kilometres of new transmission lines. Transgrid says main construction is in progress on the HumeLink East and HumeLink West sections, and lists the end of construction as proposed for 2027.

  [Read the HumeLink profile](https://stonepillar.com.au/resources/nsw-project-watch/humelink/)

- ### [Inland Rail, Illabo to Stockinbingal](https://stonepillar.com.au/resources/nsw-project-watch/#project-inland-rail-illabo-to-stockinbingal)

  Construction Ports, freight and logistics Inland Rail Pty Ltd

  **Council areas:** Junee, Cootamundra-Gundagai Regional.

  A 39 kilometre section of new Inland Rail freight track in southern NSW, running from east of Illabo north to Stockinbingal and bypassing Cootamundra and the Bethungra Spiral. The NSW Government approved the section in September 2024 and the Australian Government in October 2024. Contractor John Holland began low-impact works in January 2025, and earthworks and bridge piling started in early 2026. Inland Rail reported on 1 October 2026 that it had laid the first section of new track.

  [Read the Inland Rail, Illabo to Stockinbingal profile](https://stonepillar.com.au/resources/nsw-project-watch/#project-inland-rail-illabo-to-stockinbingal)

- ### [Project EnergyConnect](https://stonepillar.com.au/resources/nsw-project-watch/energyconnect/)

  Construction Transmission and energy Transgrid

  **Council areas:** Wentworth, Murrumbidgee, Wagga Wagga.

  EnergyConnect is an electricity interconnector of about 900 kilometres linking the NSW, South Australian and Victorian grids. Transgrid reports that construction and initial energisation are complete, with commissioning and testing continuing.

  [Read the Project EnergyConnect profile](https://stonepillar.com.au/resources/nsw-project-watch/energyconnect/)

- ### [Reconnecting River Country Program: early works](https://stonepillar.com.au/resources/nsw-project-watch/#project-reconnecting-river-country-early-works)

  Construction Water and utilities DCCEEW Water Group (formerly Water Infrastructure NSW)

  Three early works under the Reconnecting River Country Program, funded by the Australian Government, are under construction: a new Mundarlo Bridge on Tenandra Road between Gundagai and Wagga Wagga, culverts and road raising on Mundowy Lane near Collingullie, and replacement regulators in the Werai Forest. Construction of all three began in June 2026, with completion expected by December 2026 and handover in early 2027. The works include realigned approach roads and measures to keep access to properties during higher flows. The works no longer appear in the Infrastructure NSW pipeline data. Water Infrastructure NSW planned the project; the NSW Department of Climate Change, Energy, the Environment and Water says its Water Group now leads the development and delivery of the state's water infrastructure projects, and the project page sits on the department's water site.

  [Read the Reconnecting River Country Program: early works profile](https://stonepillar.com.au/resources/nsw-project-watch/#project-reconnecting-river-country-early-works)

Where

## Council areas named by these projects

Cootamundra-Gundagai Regional, Edward River, Goulburn Mulwaree, Hilltops, Junee, Murray River, Murrumbidgee, Snowy Monaro Regional, Snowy Valleys, Upper Lachlan Shire, Wagga Wagga, Wentworth, Yass Valley.

A council area is listed when a project's record names it; a project can affect land outside the areas its record names. To search by suburb, postcode or council, use [the Project Watch map](https://stonepillar.com.au/resources/nsw-project-watch/) .

## Related guidance

- [NSW Project Watch: every project, the map and the stage guide](https://stonepillar.com.au/resources/nsw-project-watch/)
- [Compulsory acquisition and compensation](https://stonepillar.com.au/services/compulsory-acquisition/)
- [I am affected by a development or infrastructure project](https://stonepillar.com.au/issues/affected-by-project/)

This page provides general information only. Project details may change and should be checked against official sources. The inclusion of a project on this page does not mean that any particular property will be acquired or affected. This page is not legal advice. Submitting an enquiry does not create a solicitor–client relationship, and any engagement is subject to conflict checks and written terms of engagement.

Where to start

## Discuss a project or land concern

Tell us what has happened and what decision you need to make. The preliminary call is to discuss whether Stone & Pillar can assist and the next step. If we can assist, scope and fees are agreed before substantive legal work begins.

[Request a call back](https://stonepillar.com.au/contact/?matter=acquisition#enquiry)

[Speak with a lawyer](https://stonepillar.com.au/contact/?matter=acquisition#schedule)

30 minutes · Phone or Teams · No charge

The complimentary 30-minute preliminary call is intended to discuss whether we can assist and what an initial scope of work would involve. It is not intended to provide legal advice. Ask us to confirm in writing the work we have agreed to undertake.

---

The information and tools on this website are general information only and are not legal advice. Please provide only a brief outline for an initial enquiry, and keep confidential or privileged documents to hand until we tell you how to provide them. Tell us any date stated in your documents. Do not assume that an enquiry or booking protects a deadline. Ask us to confirm any work we agree to undertake, including any action about a deadline. If a date is close or uncertain, seek prompt legal advice without waiting for our reply. See the full [Disclaimer](https://stonepillar.com.au/disclaimer/) and [collection notice](https://stonepillar.com.au/privacy/#collection-notice) .

© 2026 Stone & Pillar Legal · New South Wales

Stone & Pillar Legal is a business name of Stone & Pillar Pty Ltd ABN 11 698 040 854.

Liability limited by a scheme approved under professional standards legislation.