title: "Richmond Road Corridor upgrade: planning and land impacts"
description: "Richmond Road Corridor upgrade, M7 Motorway to The Driftway: concept design, investigations on private property and what Transport for NSW says on acquisition."
canonical: https://stonepillar.com.au/resources/nsw-project-watch/richmond-road-corridor-upgrade/
language: en-AU
last_updated: 2026-11-20
source_revision: 498ccea127247fe38494c2df5ab784af20b5625f
publisher: "Stone & Pillar Legal"
---

NSW Project Watch

# Richmond Road Corridor upgrade

Road · Greater Sydney · Transport for NSW

Documented stage: **Planning and assessment**

Profile publication reviewed 20 November 2026. Individual source-check dates appear below. Inclusion does not establish that any particular property will be acquired or affected.

On this page

- [Project overview](https://stonepillar.com.au/resources/nsw-project-watch/richmond-road-corridor-upgrade/#overview)
- [Possible land impacts](https://stonepillar.com.au/resources/nsw-project-watch/richmond-road-corridor-upgrade/#land-impacts)
- [Documents to gather](https://stonepillar.com.au/resources/nsw-project-watch/richmond-road-corridor-upgrade/#documents)
- [Council areas](https://stonepillar.com.au/resources/nsw-project-watch/richmond-road-corridor-upgrade/#location)
- [Official sources](https://stonepillar.com.au/resources/nsw-project-watch/richmond-road-corridor-upgrade/#sources)

## Project overview

Transport for NSW is planning upgrades of the Richmond Road corridor between the M7 Motorway and The Driftway in Sydney's north west. The contract for the concept design and review of environmental factors was awarded on 28 April 2026, and investigations on private properties are scheduled until 18 December 2026.

- [Transport for NSW, Richmond Road Corridor: M7 Motorway to The Driftway](https://www.transport.nsw.gov.au/projects/current-projects/richmond-road-corridor-m7-motorway-to-driftway)

### Planning status

Transport for NSW says the contract for the concept design and review of environmental factors was awarded to GHD on 28 April 2026. Community consultation on the strategic design ran from 7 October to 4 November 2025, and the consultation report was published in August 2026. That report lists the next steps as developing concept designs and preparing the review of environmental factors for public exhibition. The Australian and NSW Governments have provided $50 million for planning the upgrades and the future provision of additional lanes.

- [Transport for NSW, Richmond Road Corridor: M7 Motorway to The Driftway](https://www.transport.nsw.gov.au/projects/current-projects/richmond-road-corridor-m7-motorway-to-driftway)
- [Transport for NSW, Richmond Road Corridor Strategic Design Consultation Report (August 2026)](https://www.transport.nsw.gov.au/system/files/media/documents/2026/m7-motorway-the-driftway-strategic-design-consultation-report.pdf)

### Proposed upgrades

The features Transport for NSW lists include widening sections of the corridor from two to four lanes and from four to six lanes, upgrading intersections and adding new signalised intersections, and raising Richmond Road and South Creek Bridge to improve flood resilience. The consultation report says the upgrade between Elara Boulevard and Heritage Road is already under way as a separate project, and that the corridor project would further widen that section to six lanes.

- [Transport for NSW, Richmond Road Corridor: M7 Motorway to The Driftway](https://www.transport.nsw.gov.au/projects/current-projects/richmond-road-corridor-m7-motorway-to-driftway)
- [Transport for NSW, Richmond Road Corridor Strategic Design Consultation Report (August 2026)](https://www.transport.nsw.gov.au/system/files/media/documents/2026/m7-motorway-the-driftway-strategic-design-consultation-report.pdf)

### Investigations on private property

Transport for NSW says investigations to inform the concept design are being carried out on private properties from 25 May to 18 December 2026, weather permitting, on and around Richmond Road, including The Northern Road, Blacktown Road, Bennett Road, St Marys Road, Racecourse Road and Clydesdale Farm Road. Its May 2026 notification lists survey, utility, geotechnical, environmental and heritage investigations. Further field investigations run from 8 July to 18 December on and around George Street in Bligh Park.

- [Transport for NSW, Richmond Road Corridor: M7 Motorway to The Driftway](https://www.transport.nsw.gov.au/projects/current-projects/richmond-road-corridor-m7-motorway-to-driftway)
- [Transport for NSW, investigation work on private properties notification (May 2026)](https://www.transport.nsw.gov.au/system/files/media/documents/2026/Richmond%20Road%20Corridor%20-%20Investigations%20on%20Private%20property%20CU%20Final%20050526.pdf)

### Property acquisition

The August 2026 consultation report says some property acquisition may be required to deliver the widened corridor, drainage infrastructure and associated safety improvements, and that the extent of acquisition remains indicative at the current design stage. It says that if the project is funded for delivery, Transport for NSW will contact affected owners for individual discussions before any formal acquisition process.

- [Transport for NSW, Richmond Road Corridor Strategic Design Consultation Report (August 2026)](https://www.transport.nsw.gov.au/system/files/media/documents/2026/m7-motorway-the-driftway-strategic-design-consultation-report.pdf)

## What this could mean for a property

Transport for NSW's August 2026 consultation report says some property acquisition may be required to deliver the widened corridor, drainage infrastructure and associated safety improvements, and that the extent remains indicative at the current design stage. It says that if the project is funded for delivery, Transport for NSW will contact affected owners for individual discussions before any formal acquisition process. A project being planned near you does not mean your property will be acquired.

### Key things to watch

- The concept design and the review of environmental factors, when exhibited
- Whether your land or access is affected
- Any survey, valuation or acquisition correspondence
- Any change to the extent of acquisition as the design is refined

### Possible land impacts

- Property acquisition for the widened corridor and drainage, where required
- Severance and access effects for retained land
- Changes to road levels and property access where the road is widened or raised
- Construction noise, vibration and amenity impacts

## Possible impact types

- Partial acquisition
- Severance / retained land
- Access change
- Planning / corridor constraint
- Noise / vibration / amenity

## Documents worth gathering

- Any letter or notice from the project
- Your title search and deposited plan
- Section 10.7 planning certificate
- Valuation, rating or appraisal material

## Location and relevant interests

**Council areas:** Blacktown, Penrith, Hawkesbury.

**Often relevant to:** Owners and occupiers along the corridor; Owners of properties where investigations are being carried out; Local businesses affected by access changes.

## Related land guidance

- [Partial acquisitions and retained land](https://stonepillar.com.au/issues/partial-acquisitions/)
- [My land is being acquired](https://stonepillar.com.au/issues/land-acquisition/)
- [Affected by a project](https://stonepillar.com.au/issues/affected-by-project/)
- [Compulsory acquisition](https://stonepillar.com.au/services/compulsory-acquisition/)

## Official sources

- [Transport for NSW, Richmond Road Corridor: M7 Motorway to The Driftway](https://www.transport.nsw.gov.au/projects/current-projects/richmond-road-corridor-m7-motorway-to-driftway)

  Source checked 20 November 2026.

- [Transport for NSW, Richmond Road Corridor Strategic Design Consultation Report (August 2026)](https://www.transport.nsw.gov.au/system/files/media/documents/2026/m7-motorway-the-driftway-strategic-design-consultation-report.pdf)

  Source checked 20 November 2026. The passages on next steps, land acquisition and the Marsden Park section were read on 20 November 2026. The rest of the 43-page report was not read.

- [Transport for NSW, investigation work on private properties notification (May 2026)](https://www.transport.nsw.gov.au/system/files/media/documents/2026/Richmond%20Road%20Corridor%20-%20Investigations%20on%20Private%20property%20CU%20Final%20050526.pdf)

  Source checked 20 November 2026.

- [Infrastructure NSW, Major Projects Pipeline (In planning)](https://www.infrastructure.nsw.gov.au/industry/construction-industry/pipeline-of-projects/)

  Source checked 20 November 2026. Row read on 20 November 2026 from the pipeline page, last updated 28 September 2026.

Project record checked 19 October 2026

Project information is indicative. It does not establish that a particular property is affected.

[Discuss this project : Richmond Road Corridor upgrade](https://stonepillar.com.au/contact/?matter=acquisition&project=richmond-road-corridor-upgrade#enquiry) [Watch this project : Richmond Road Corridor upgrade](https://stonepillar.com.au/resources/nsw-project-watch/?watch=richmond-road-corridor-upgrade#watch)

About the dates: the publication review records when this profile was approved for publication. Each official source has its own check date. The project record date refers to the catalogue entry. These dates do not establish that later project changes have been checked.

To cite this page: Stone & Pillar Legal, “Richmond Road Corridor upgrade”, NSW Project Watch, profile reviewed 20 November 2026, https\://stonepillar.com.au/resources/nsw-project-watch/richmond-road-corridor-upgrade/

This page provides general information only. Project details may change and should be checked against official sources. The inclusion of a project on this page does not mean that any particular property will be acquired or affected. This page is not legal advice. Submitting an enquiry does not create a solicitor–client relationship, and any engagement is subject to conflict checks and written terms of engagement.

[Find this project on the Project Watch hub](https://stonepillar.com.au/resources/nsw-project-watch/#project-richmond-road-corridor-upgrade)

Where to start

## Discuss your project or land concern

Tell us what has happened and what decision you need to make. The preliminary call is to discuss whether Stone & Pillar can assist and the next step. If we can assist, scope and fees are agreed before substantive legal work begins.

[Request a call back](https://stonepillar.com.au/contact/?matter=acquisition#enquiry)

[Speak with a lawyer](https://stonepillar.com.au/contact/?matter=acquisition&project=richmond-road-corridor-upgrade#schedule)

30 minutes · Phone or Teams · No charge

The complimentary 30-minute preliminary call is intended to discuss whether we can assist and what an initial scope of work would involve. It is not intended to provide legal advice. Ask us to confirm in writing the work we have agreed to undertake.

---

The information and tools on this website are general information only and are not legal advice. Please provide only a brief outline for an initial enquiry, and keep confidential or privileged documents to hand until we tell you how to provide them. Tell us any date stated in your documents. Do not assume that an enquiry or booking protects a deadline. Ask us to confirm any work we agree to undertake, including any action about a deadline. If a date is close or uncertain, seek prompt legal advice without waiting for our reply. See the full [Disclaimer](https://stonepillar.com.au/disclaimer/) and [collection notice](https://stonepillar.com.au/privacy/#collection-notice) .

© 2026 Stone & Pillar Legal · New South Wales

Stone & Pillar Legal is a business name of Stone & Pillar Pty Ltd ABN 11 698 040 854.

Liability limited by a scheme approved under professional standards legislation.