# VNI West (NSW section) and South West REZ network upgrade

Transmission and energy · Riverina and Southern NSW · Transgrid

Documented stage: **Planning and assessment**

Profile publication reviewed 20 November 2026. Individual source-check dates appear below. Inclusion does not establish that any particular property will be acquired or affected.

On this page

- [Project overview](https://stonepillar.com.au/resources/nsw-project-watch/vni-west-nsw/#overview)
- [Possible land impacts](https://stonepillar.com.au/resources/nsw-project-watch/vni-west-nsw/#land-impacts)
- [Documents to gather](https://stonepillar.com.au/resources/nsw-project-watch/vni-west-nsw/#documents)
- [Council areas](https://stonepillar.com.au/resources/nsw-project-watch/vni-west-nsw/#location)
- [Official sources](https://stonepillar.com.au/resources/nsw-project-watch/vni-west-nsw/#sources)

## Project overview

A proposed 500 kV double-circuit transmission line linking the NSW and Victorian electricity grids. In NSW it would run for about 240 kilometres between the Victorian border near Murrabit and the Dinawan substation north of Jerilderie. Transgrid's project page, read on 20 November 2026, says the Department of Planning, Housing and Infrastructure is reviewing the application and that Transgrid anticipates a decision on project approval in late 2026.

- [Transgrid, Victoria to NSW Interconnector West (VNI West)](https://www.transgrid.com.au/projects-innovation/vni-west/)
- [NSW Planning Portal, Victoria to NSW Interconnector West (SSI-72887208)](https://www.planningportal.nsw.gov.au/major-projects/projects/victoria-nsw-interconnector-west)
- [Transgrid, VNI West (NSW) EIS summary document](https://www.transgrid.com.au/media/axkgbhlm/vni_west_nsw_eis_00_summary_document.pdf)

### Route and scope

Transgrid's environmental impact statement summary describes new double-circuit 500 kV transmission lines from the NSW and Victorian border to the future Dinawan substation, a distance of around 240 kilometres. It also describes the demolition and rebuild of about nine kilometres of an existing 330 kV line near Wagga Wagga, and an expansion of the future Dinawan substation.

- [Transgrid, VNI West (NSW) EIS summary document](https://www.transgrid.com.au/media/axkgbhlm/vni_west_nsw_eis_00_summary_document.pdf)
- [NSW Planning Portal, Victoria to NSW Interconnector West (SSI-72887208)](https://www.planningportal.nsw.gov.au/major-projects/projects/victoria-nsw-interconnector-west)
- [Transgrid, Victoria to NSW Interconnector West (VNI West)](https://www.transgrid.com.au/projects-innovation/vni-west/)

### Planning status

The environmental impact statement was on public exhibition from 1 to 29 August 2025. Transgrid's fact sheet on the Submissions Report and Amendment Report says both have been submitted to the Department of Planning, Housing and Infrastructure for review before a determination is made. It says the amendments include delivering the project in two stages and additional equipment at the future Dinawan substation. On 20 November 2026 the NSW Planning Portal showed the application (SSI-72887208) at the More Information Required stage. Transgrid's project page, read on the same day, says it anticipates a decision on project approval in late 2026.

- [Transgrid, VNI West Submissions and Amendment Report fact sheet (July 2026)](https://www.transgrid.com.au/media/n5dnppeq/vni_submission_and_amendment_report_summary_fact_sheet_04_digital-1.pdf)
- [NSW Planning Portal, Victoria to NSW Interconnector West (SSI-72887208)](https://www.planningportal.nsw.gov.au/major-projects/projects/victoria-nsw-interconnector-west)
- [Transgrid, Victoria to NSW Interconnector West (VNI West)](https://www.transgrid.com.au/projects-innovation/vni-west/)

### South West REZ works

On 10 July 2026 EnergyCo announced a Project Development Deed with Transgrid for the South West Renewable Energy Zone. EnergyCo says the agreement accelerates works that include upgrading Dinawan substation to operate at 500 kV, a new switchyard at Dinawan, and converting the existing Dinawan to Wagga Wagga powerlines from 330 kV to 500 kV.

- [EnergyCo, South West REZ Project Development Deed signed (10 July 2026)](https://www.energyco.nsw.gov.au/news/south-west-rez-project-development-deed-signed)

### Land and easements

Transgrid's land use and agriculture fact sheet says land and easements will be acquired in consultation with landholders and in line with legislation, with compensation under the Land Acquisition (Just Terms Compensation) Act 1991 and additional Strategic Benefit Payments for landowners hosting infrastructure. It says individual Property Management Plans will be developed in consultation with landholders. The environmental impact statement summary says the easement for the new 500 kV lines would typically be 70 metres wide, and up to around 110 metres at some locations.

- [Transgrid, VNI West land use and agriculture fact sheet (August 2025)](https://www.transgrid.com.au/media/o1ofxfum/vni_west_10_land_use_agriculture_factsheet_aug25.pdf)
- [Transgrid, VNI West (NSW) EIS summary document](https://www.transgrid.com.au/media/axkgbhlm/vni_west_nsw_eis_00_summary_document.pdf)

## What this could mean for a property

Transgrid's August 2025 fact sheet says land and easements will be acquired in consultation with landholders and in line with legislation, with compensation under the Land Acquisition (Just Terms Compensation) Act 1991 and additional Strategic Benefit Payments for landowners hosting infrastructure. Its environmental impact statement summary, which predates the Amendment Report, says the new 500 kV lines would need an easement typically 70 metres wide, and up to around 110 metres at some locations, that most of the land in the project footprint is used for agriculture, and that construction would need temporary leases or licences of land. Being near the proposed route does not mean a property will be affected, but easement terms, property management plans and access arrangements are worth understanding before anything is signed.

### Key things to watch

- The State and Commonwealth approval decisions, which Transgrid anticipates in late 2026, and any conditions
- Easement offers, property management plans and how long negotiation runs before any compulsory acquisition step
- Works at Dinawan under the South West REZ Project Development Deed
- Timing of the line between Dinawan and the Victorian border

### Possible land impacts

- Transmission line and access easements, typically 70 metres wide for the new 500 kV line
- Acquisition of land for permanent works, where required
- Temporary leases or licences of land for construction and ancillary facilities
- Ongoing limits within the easement, including on aerial agriculture and some farm operations

## Possible impact types

- Easement
- Partial acquisition
- Construction lease
- Severance / retained land
- Noise / vibration / amenity

## Documents worth gathering

- The EIS, Amendment Report and Submissions Report on the NSW Planning Portal (SSI-72887208)
- Any easement offer, option or property management plan from Transgrid
- Your title search and deposited plan
- Farm maps and records of airstrips, irrigation and aerial operations

## Location and relevant interests

**Council areas:** Murray River, Edward River, Murrumbidgee, Wagga Wagga.

**Often relevant to:** Landholders along the proposed route between the Victorian border near Murrabit and Dinawan; Landholders near the Dinawan substation and the line works near Wagga Wagga; Farm businesses, irrigators and aerial agriculture operators.

## Related land guidance

- [Transmission or renewables](https://stonepillar.com.au/issues/transmission-easements/)
- [I received a PAN](https://stonepillar.com.au/issues/proposed-acquisition-notice/)
- [Compensation objections](https://stonepillar.com.au/issues/compensation-objections/)
- [Land access and easements](https://stonepillar.com.au/services/land-access-easements/)
- [Compulsory acquisition](https://stonepillar.com.au/services/compulsory-acquisition/)
- [Affected by a project](https://stonepillar.com.au/issues/affected-by-project/)

## Official sources

- [Transgrid, Victoria to NSW Interconnector West (VNI West)](https://www.transgrid.com.au/projects-innovation/vni-west/)

  Source checked 20 November 2026.

- [NSW Planning Portal, Victoria to NSW Interconnector West (SSI-72887208)](https://www.planningportal.nsw.gov.au/major-projects/projects/victoria-nsw-interconnector-west)

  Source checked 20 November 2026.

- [Transgrid, VNI West (NSW) EIS summary document](https://www.transgrid.com.au/media/axkgbhlm/vni_west_nsw_eis_00_summary_document.pdf)

  Source checked 20 November 2026. The passages on the route, easement widths, land use and construction were read on 20 November 2026. The summary predates the Amendment Report.

- [Transgrid, VNI West Submissions and Amendment Report fact sheet (July 2026)](https://www.transgrid.com.au/media/n5dnppeq/vni_submission_and_amendment_report_summary_fact_sheet_04_digital-1.pdf)

  Source checked 20 November 2026.

- [Transgrid, VNI West land use and agriculture fact sheet (August 2025)](https://www.transgrid.com.au/media/o1ofxfum/vni_west_10_land_use_agriculture_factsheet_aug25.pdf)

  Source checked 20 November 2026.

- [EnergyCo, South West REZ Project Development Deed signed (10 July 2026)](https://www.energyco.nsw.gov.au/news/south-west-rez-project-development-deed-signed)

  Source checked 20 November 2026.

Project record checked 19 October 2026

Project information is indicative. It does not establish that a particular property is affected.

[Discuss this project : VNI West (NSW section) and South West REZ network upgrade](https://stonepillar.com.au/contact/?matter=acquisition&project=vni-west-nsw#enquiry) [Watch this project : VNI West (NSW section) and South West REZ network upgrade](https://stonepillar.com.au/resources/nsw-project-watch/?watch=vni-west-nsw#watch)

About the dates: the publication review records when this profile was approved for publication. Each official source has its own check date. The project record date refers to the catalogue entry. These dates do not establish that later project changes have been checked.

To cite this page: Stone & Pillar Legal, “VNI West (NSW section) and South West REZ network upgrade”, NSW Project Watch, profile reviewed 20 November 2026, https\://stonepillar.com.au/resources/nsw-project-watch/vni-west-nsw/

This page provides general information only. Project details may change and should be checked against official sources. The inclusion of a project on this page does not mean that any particular property will be acquired or affected. This page is not legal advice. Submitting an enquiry does not create a solicitor–client relationship, and any engagement is subject to conflict checks and written terms of engagement.

## Related project profiles

- [HumeLink](https://stonepillar.com.au/resources/nsw-project-watch/humelink/)
- [Project EnergyConnect](https://stonepillar.com.au/resources/nsw-project-watch/energyconnect/)

[Find this project on the Project Watch hub](https://stonepillar.com.au/resources/nsw-project-watch/#project-vni-west-nsw)

Where to start

## Discuss your project or land concern

Tell us what has happened and what decision you need to make. The preliminary call is to discuss whether Stone & Pillar can assist and the next step. If we can assist, scope and fees are agreed before substantive legal work begins.

[Request a call back](https://stonepillar.com.au/contact/?matter=acquisition#enquiry)

[Speak with a lawyer](https://stonepillar.com.au/contact/?matter=acquisition&project=vni-west-nsw#schedule)

30 minutes · Phone or Teams · No charge

The complimentary 30-minute preliminary call is intended to discuss whether we can assist and what an initial scope of work would involve. It is not intended to provide legal advice. Ask us to confirm in writing the work we have agreed to undertake.

---

The information and tools on this website are general information only and are not legal advice. Please provide only a brief outline for an initial enquiry, and keep confidential or privileged documents to hand until we tell you how to provide them. Tell us any date stated in your documents. Do not assume that an enquiry or booking protects a deadline. Ask us to confirm any work we agree to undertake, including any action about a deadline. If a date is close or uncertain, seek prompt legal advice without waiting for our reply. See the full [Disclaimer](https://stonepillar.com.au/disclaimer/) and [collection notice](https://stonepillar.com.au/privacy/#collection-notice) .

© 2026 Stone & Pillar Legal · New South Wales