Skip to content
NSW Project Watch

Moruya Bypass (Princes Highway)

Road · Illawarra and South Coast · Transport for NSW

Documented stage: Corridor / option identified

Profile publication reviewed . Individual source-check dates appear below. Inclusion does not establish that any particular property will be acquired or affected.

Project overview

A proposed two-lane, nine kilometre bypass of Moruya on the South Coast, to the east of the existing Princes Highway. In July 2024 Transport for NSW identified a refined Orange corridor as the preferred option and said the corridor will be reserved for future construction.

Preferred corridor

Transport for NSW announced the refined Orange corridor as its preferred option in July 2024, concluding the planning phase. Its media release describes a two-lane, nine kilometre bypass to the east of the existing Princes Highway, from north of Malabar Drive to south of Mountain View Road. Its July 2024 answers to common questions list a bridge about 3.8 kilometres long across the floodplain and Moruya River, connections to the existing highway near Shelley Road and Mountain View Road, and potential realignment of local roads.

Funding and timing

Transport for NSW says the corridor will be reserved for future construction, which it estimates will cost in excess of $1.7 billion. It said in July 2024 that funding for the concept design, environmental assessment and construction would need to be sought, and that the next phase of planning was not expected to proceed in the medium term. The latest news on the project page, read on 20 November 2026, is dated July 2024.

Property owners in the corridor

Transport for NSW's July 2024 answers say no properties within the preferred corridor will be required for acquisition at this time, and that it will have individual discussions with property owners. They say it is working with Eurobodalla Shire Council to have sections of the corridor listed in the council's local environmental plan.

What this could mean for a property

Transport for NSW has said the decision may lead to future impacts for property owners in the refined Orange corridor and that it is working with them on individual concerns. Its July 2024 answers to common questions say no properties in the corridor will be required for acquisition at this time, and that it is working with Eurobodalla Shire Council to have sections of the corridor listed in the council's local environmental plan. Those statements date from July 2024, and the project page shows no later news. A project being planned near you does not mean your property will be acquired.

Key things to watch

  • Listing of the corridor in the Eurobodalla local environmental plan
  • Any contact from Transport for NSW about your property
  • Funding for concept design and environmental assessment
  • Whether owner-initiated (hardship) acquisition becomes available once the corridor is protected

Possible land impacts

  • Planning controls, if sections of the corridor are listed in the local environmental plan
  • Possible future acquisition, if the bypass is funded and proceeds
  • Severance of rural land and changed property access
  • Noise, visual and amenity effects near the route and bridges

Possible impact types

  • Planning / corridor constraint
  • Partial acquisition
  • Severance / retained land
  • Access change
  • Noise / vibration / amenity

Documents worth gathering

  • Any letter from Transport for NSW about the corridor
  • Section 10.7 planning certificate
  • Your title search and deposited plan
  • The July 2024 Preferred Option Report and corridor maps

Location and relevant interests

Council areas: Eurobodalla.

Often relevant to: Owners of land within the refined Orange corridor; Owners near the northern and southern connections to the Princes Highway; Farm businesses on the floodplain land the corridor crosses.

Official sources

Project record checked

Project information is indicative. It does not establish that a particular property is affected.

Find this project on the Project Watch hub

Where to start

Discuss your project or land concern

Tell us what has happened and what decision you need to make. The preliminary call is to discuss whether Stone & Pillar can assist and the next step. If we can assist, scope and fees are agreed before substantive legal work begins.

Request a call back

Speak with a lawyer

30 minutes · Phone or Teams · No charge

The complimentary 30-minute preliminary call is intended to discuss whether we can assist and what an initial scope of work would involve. It is not intended to provide legal advice. Ask us to confirm in writing the work we have agreed to undertake.

Speak with a lawyer Call